    Green Energy Program(GEP) Phase II Project

Owner: SK E&S / SK Energy (PMC)

Client: Huyndai E&C

Location: Boryong, Chungchung Nam Do

Project detail

The project encompasses two significant packages aimed at advancing industrial processes and environmental sustainability.

Package 1 Auto Thermal Reformer with ASU & CO2 Capture & PSA → 125,000 TPA × 2 Trains Utility & Offsite

Package 2 Hydrogen Liquefaction Unit (LH2) → 50 TPD × 3 Trains (50,000 TPA) CO2 Liquefaction Unit (LCO2) → Captured CO2 Gas 1,100,000 TPA × 2 Trains Marine Loading Terminal (CO2)

With our team of experienced engineers, KPEG has meticulously prepared Front End Engineering Design (FEED) data including Plot plan development, Piping Structure & Civil design engineering, 3D model for the whole project.